2 weeks later, 17th October we had pipes!! 😍
Following this, things came to a grinding halt for a while...due to our soil type, the slab height needed to be millimetre perfect and of course the trades that completed our site cut hadn’t got that instruction! The slab design had to be re-engineered to facilitate thicker waffle pods...oh, the joys!!
After driving by on Saturday the 28th October (end of week #4) we were surprised to see our slab! Beautiful isn’t it?!